Florida Marine Construction
- Posted: January 18, 2017
-
By:
Deprecated: str_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /www/muxamigu_476/public/wp-includes/formatting.php on line 4290
Another Old Florida Style dock with a roof to shade the Hinckley – Captiva, Florida.
Exquisite Boat House & Dock installation on Boca Grande.
Lovely Island dock with 12,000lbs. vertical boat lift. Such a beautiful spot in Southwest Florida
New state of the Art 26 slip marina with associated Boat Houses.
32 foot Hinckley with 20,000lbs. Boat house Lift.
Absolutely perfect small boat marina for North Captiva Island Club.
Small boat marina facility for South Seas Plantation, Captiva Island.
Dredging Main Marina Entrance Sanibel Florida
Helical Tiebacks installation for Concrete Seawall.
Rip-Rap protected shoreline bordering Gulf of Mexico.
Cantilevered Steel Sheet Piling Wall, Bayside Marina.
Florida Marine Construction installing commercial concrete seawall slabs in Southwest Florida
Premier docking facility at beautiful Cayo Costa State Park
Old Florida Dock design with 20,000lbs. and 12,000lbs. Sea Drive Lifts Captiva, Florida.
Exceptional quality boat house for a exceptional yacht.
Ahoy! A choice location to store a vessel and an open deck to enjoy life upon.
The Scout nestled conformably within her covered home North Captiva Island.
Personal Watercraft lifts situated on a unbridged Florida Island, Spectacular views!
A dedicated dock rebuild on private Burgess Island with a the chair at docks end.
Spectacular Old Florida Island dock configuration.
North Captiva Island Club Marina.
A closer view of the Scout’s home with her award winning tarpon boat on a beautifully constructed boat lift.
Aerial View of Completed North Captiva Island Club Marina.
Cayo Costa State Park concrete floating ferry terminal.
Public Marine Safety Docking facilities for the City Of Sanibel.
Early morning mist on environmental boardwalk structure.
Lumberock Boardwalk for Florida Department of Environmental Protection.
Innovative Lap pool within floating dock facility with amenities.
Aluminum Floating Dock Staging for 130 slip marina in Fort Myers Beach Florida.
New access walkway for Cayo Costa State Park.
Florida Marine Construction installing 50 foot ICP Pipe pilings for Snook Bight Marina.
Drone view of Bayside Marina under construction on Captiva Island.
Florida Marine Construction erecting steel sheet piling wall for D.O.T. road project.
Concrete Foundation Piling to sustain 80 ton forklift launch pad in Sweetwater Landing.
Concrete Foundation Piling for 250,000lbs. Forklift Launch Pad.
Commercial concrete Seawall complete awaiting installation of concrete fork lift pad.
36” RCP through concrete seawall for outflow pipe.
Florida Marine Construction driving 62 foot test piling for Weeks Fish Camp Marina.
Florida Marine Construction installing 55 foot concrete anchor piling for floating docks in Naples, Florida.
Exceptional new fuel dock and amenities for South Seas Plantation.
Long Reach Marina, Florida Marine Construction performing marina demolition.
Florida Marine Construction providing dockside dredging for Marco Island client.
Florida Marine Construction excavating entrance channel to Sanibel Island Marina.
Early Morning excavator loading. Off to work we go!
Florida Marine Construction staging floating equipment for 12,000 cubic yard dredging project.
In haul dredging material for Lovers Key State Park.
Modular dredge ferry barges awaiting spoil unloading.
Florida Marine Construction removing historic dredge on Orange River.
Early Morning excavator loading. Off to work we go!
Florida Marine Construction erecting helical anchors beneath 20,000 sq. foot. house to sustain new vinyl seawall.
Installing Helical anchors beneath tide line to sustain concrete seawall.
View of helixes prior to installation for seawall anchoring.
Helical Tiebacks with 90 degree hooks placed into seawall cap forms.
Helical awaiting additional mounting hardware for immersion into seawall cap.
Bolstering existing rock revetment, Redfish Pass, Captiva Island.
Long Reach Excavator placing 3 ton armor stone on shoreline.
Rip-Rap installation to protect shoreline from Gulf of Mexico wave attack.
Florida Marine Construction performing emergency shoreline protection.
Severely scoured coastal shoreline after major tsunami occurrence on Redfish Pass.
Lands-End Shoreline after gulf tsunami event.
Upland vinyl seawall to increase lot elevation.
Vinyl seawall installation complete, templates removed and awaiting formwork.
600 foot of steel sheet piling cantilevered wall design installed in front of old seawall.
Sheet Piling wall completed IN North Naples, Florida.
Reinforcing steel placement for concrete seawall slab.
3000 lineal foot of seawall panels awaiting installation Weeks Fish Camp Marina.
Florida Marine Construction completion of concrete seawall panels for Weeks Fish Camp.
Vista of Steel Sheet piling installed 18” in front of concrete seawall.
View of reinforcing steel placement within formworks.
Concrete Seawall Installation utilizing modular barge within lake.
Florida Marine Construction installed 5,000 lineal foot of concrete seawall at Sweetwater Landing.
Concrete Seawall Installation on Upper Captiva Island, Beautiful Island
Loading small long reach onto barge for lake bank remediation’s in Bonita Springs.
Lake Bank Restoration, Gulf Harbor Marina.
Rolling out TRM to incase in trench trough for stabilization.
Pinning down TRM in preparation of sod placement.
Florida Marine Construction installing Turf Reinforcement Mat, Gulf Harbor Marina.
Completed lake bank renovation with sod and native vegetation.
View of eroded lake bank shoreline prior to remediation influence.
View of eroded lake bank shoreline prior to remediation influence.
TRM with sod attached, awaiting #57 stone placement for anchoring.
View of severe escarpment erosion on lake shore.
Lake shoreline with scoured bank cleared for geo-web placement.
Another excellent lake bank restoration project Naples Florida.
The photo depicts the quality of work Florida Marine Construction provides.
Florida Marine Construction completed bank remediation Gulf Harbor Marina.
Installation of clean washed lime rock rip-rap along lake shoreline.
Barge mounted long reach excavator prepping shoreline for geo-web installations.
When you excel in craftsmanship the neighbors have to have one too!